1976 - Supply, install and commission Boiler instrumentation for Kenyatta National Hospital.
                                               
1977 - Supply, install and commission Flow & Level instrumentation for Sasuma Dam Water Treatment Plant.

1979 - Supply, install and commission Process Control Instrumentation for Cement Plant. EA Portland Cement.

1980 - Supply, install and commission Flow & Level instrumentation for Kabete Water Treatment Plant.

1980 - Installation and Commissioning of Process Control Instrumentation for Pilot Plant. Magadi Soda Ltd.

1982 - Supply, install and commission instrumentation for Thika Water Treatment Plant.

1982 - Supply, install and commission instrumentation for Kariobangi Sewerage Treatment Works.

1986 - Supply, install and commission instrumentation for Sosiani Water Treatment Plant. Eldoret.

1991 - Servicing of Flow Instruments for 7 Towns in Uganda.

1994 - Supply, installation and commissioning of swimming pool plant, hotwater system and water treatment plant at Ol Jogi.

2003 - Pre-commissioning of Pressure transmitters at Morendat Pumping Station. Naivash. Kenya Pipeline Co.

2005 - Installation of Magic Mist, Humidification equipment at BAT Kenya Ltd.

2009 - Phase 1- Air conditioning/Humidification of Cut Tobacco Stores, at BAT Kenya Ltd.

2009 - Supply and install Chilled Water System at BAT Kenya Ltd.

2010 - Air conditioning/ Ventilation (Sub-contract with Shanker Electronics Ltd) at Ole Sereni Hotel

2010 - Air conditioning of Server Room (Sub-contract with Shanker Electronics Ltd) at KDN.

2010 - Phase 2 - Air conditioning/Humidification of Cut Tobacco Stores, at BAT Kenya Ltd.

2011 - Basement/Toilet Ventilation at Kushi Towers – NK Brothers Ltd.